
BMJ
PACKAGING·ISLAND
A cylindrical island stand you can walk all the way around, with a continuous LED band above and a timber-slatted drum below.
Exhibition stand design · fabrication · installation
Custom stand design, fabrication, installation and support for the duration of the show. One contractor, from drawing to handover.
BASELINE Dekorasyon is an Istanbul-based company that designs, fabricates and installs custom exhibition stands for brands.
01
Surfaces, joints and lighting are resolved in the workshop. The quality of a stand shows on the first morning, not after the fair closes.
02
A stand is not a sculpture, it is a place of work. The ratio between meeting, display, storage and welcome areas follows the visitor flow.
03
The fair does not move. The production schedule is planned backwards from the build-up window, and parts are assembled before they ship.
Selected work
Every stand with its own record. Material, lighting, layout.
Scroll to move along
The problem
Approving the budget is not the end of the job; it is where the difficulty starts. The fair authority's approval file, your position in the hall, the height of neighbouring stands, power and rigging applications, how many days the build-up window actually gives you. If each of these goes to a different party, the process stretches. If they go to one, you open on day one ready.
All four are common in this business. None of them is a design problem.
Services
Four lines of work, one point of responsibility. We can take over at whichever stage you are at.
We translate brand identity into three dimensions.
Production is what closes the gap between the drawing and the real thing.
The deadline is not negotiable; the fair will not wait for you.
Brand experience does not end at the fairground.
Process
The schedule does not run forwards. The build-up window is fixed, and everything else arranges itself around it.
The first conversation is about what the stand has to do, not what it will look like. The fair, your position on the hall plan, the area and the number of open sides, the budget range, your objective and how many people will work the stand are all settled here. Photographs of your previous stands and where your competitors sit in the same hall come into it too. Anything drawn without this data is guesswork.
The layout comes first: where visitors are met, where meetings happen, which surfaces carry product, where storage and catering sit. Once those proportions hold, material, colour and lighting decisions follow and the design becomes a photorealistic 3D render. The render is not there to look good; it is there so the people who cannot walk the stand can approve it. In the same step the design is checked against what can actually be built and against the venue’s technical manual.
The design is worked on and brought down to one approved version. Revisions are taken in rounds: moving on a single consolidated list from your side, rather than on comments arriving one at a time, is what keeps the schedule short. The approved design is then frozen, technical drawings are produced, and the approval file goes to the fair authority ahead of its deadline. For double-decker stands, structural calculations and engineer sign-off are completed here as well.
The approved project becomes a parts list and a manufacturing schedule, planned backwards from the fair date. Joinery, metalwork, print and lighting run in parallel, each with its own quality check. Wherever it is possible, the stand is assembled in the workshop before it ships — the fairground is not where a mistake should be found. Sharing progress photographs through production is normal practice, and it matters most for brands travelling in from abroad.
Parts are loaded in the order they will be installed and go into the hall inside the build-up window set by the organiser. The sequence is fixed: structure, flooring, cladding, graphics, lighting, furniture, cleaning. Power, water and rigging are coordinated with the authority, and its inspections are handled as the build goes up. If a heavy machine or a large exhibit is going in, it enters before the walls close — which makes the delivery date of your product part of the installation plan.
Through the show days there is a technician you can reach; problems with lighting, power, surfaces or furniture are dealt with the same day. After the fair closes, dismantling happens inside the window the authority gives and the space is handed back — that window is short, and overrunning it carries a charge. Units intended for reuse are set aside and the rest is separated and removed. Photographing the stand during the fair gives you both an archive and the starting data for the next one.
Cost
Square metres, storeys, materials, printed area and build-up time. We talk through those five before quoting a figure — because the same floor area can be two completely different jobs.
Industries
A hygienic surface at a food fair and a load-bearing floor at a machinery fair are not the same job. Pick your industry and see the work.
Common questions
Start here
Send us your floor plan, your square metres and your date. On the first reply we will tell you plainly what is possible and what will not make it.
Quotes are free and commit you to nothing.