03·Services
Installation & Logistics
The deadline is not negotiable; the fair will not wait for you.
The hard part of this business is not production, it is the calendar. The build-up window is usually a few days, and missing it cannot be recovered. Transport, the on-site crew, technical support during the fair and dismantling sit with one party — so you have one person to call.
Services
What's included
- 03.1Transport and delivery planning to the fairground
- 03.2On-site installation crew and site supervisor
- 03.3Coordination of power, water and rigging with the fair authority
- 03.4Technical support for the duration of the fair
- 03.5Dismantling and handover of the space
- 03.6Storage of reusable components
Services
How it runs
- 01
Shipping
Parts are loaded in installation order. Nothing has to be hunted for on site.
- 02
Build-up
Structure, cladding, graphics, lighting and furniture, in that order. Fair authority inspections are handled along the way.
- 03
Show days
A technician you can reach. Lighting, power or surface issues are solved the same day.
- 04
Dismantling
Dismantling and handover within the window set by the fair authority. Reusable parts are set aside.
Services
Four lines of work, one responsibility.
- 01Stand DesignWe translate brand identity into three dimensions.
- 02Stand ProductionProduction is what closes the gap between the drawing and the real thing.
- 03Installation & LogisticsThe deadline is not negotiable; the fair will not wait for you.
- 04Events & ShowroomsBrand experience does not end at the fairground.
Start here
Is your fair date getting close?
Send us your floor plan, your square metres and your date. On the first reply we will tell you plainly what is possible and what will not make it.
Quotes are free and commit you to nothing.