Process
Planned backwards from the fair date.
The build-up window is fixed. The schedule is built backwards from it, not forwards from today.
- 01
Brief & Discovery
The first conversation is about what the stand has to do, not what it will look like. The fair, your position on the hall plan, the area and the number of open sides, the budget range, your objective and how many people will work the stand are all settled here. Photographs of your previous stands and where your competitors sit in the same hall come into it too. Anything drawn without this data is guesswork.
What we need from you
The name and dates of the fair, the floor plan and technical manual from the organiser, your area and open sides, brand identity files, a budget range, and the concrete result you want from the fair.
- 02
Concept & 3D Design
The layout comes first: where visitors are met, where meetings happen, which surfaces carry product, where storage and catering sit. Once those proportions hold, material, colour and lighting decisions follow and the design becomes a photorealistic 3D render. The render is not there to look good; it is there so the people who cannot walk the stand can approve it. In the same step the design is checked against what can actually be built and against the venue’s technical manual.
What we need from you
A list of the products and samples you will show, with sizes and weights; what has to happen on the stand (tasting, demos, meetings, storage); the content for any screens; logo files and colour references.
- 03
Revision & Approval
The design is worked on and brought down to one approved version. Revisions are taken in rounds: moving on a single consolidated list from your side, rather than on comments arriving one at a time, is what keeps the schedule short. The approved design is then frozen, technical drawings are produced, and the approval file goes to the fair authority ahead of its deadline. For double-decker stands, structural calculations and engineer sign-off are completed here as well.
What we need from you
One consolidated revision list gathered from your internal stakeholders, written final approval, the exhibitor documents the fair authority asks for, and the letter authorising us to work on your space.
- 04
Production
The approved project becomes a parts list and a manufacturing schedule, planned backwards from the fair date. Joinery, metalwork, print and lighting run in parallel, each with its own quality check. Wherever it is possible, the stand is assembled in the workshop before it ships — the fairground is not where a mistake should be found. Sharing progress photographs through production is normal practice, and it matters most for brands travelling in from abroad.
What we need from you
Print-ready artwork and final copy, the date your products will reach the fairground, and sign-off on any bespoke furniture or equipment.
- 05
Installation
Parts are loaded in the order they will be installed and go into the hall inside the build-up window set by the organiser. The sequence is fixed: structure, flooring, cladding, graphics, lighting, furniture, cleaning. Power, water and rigging are coordinated with the authority, and its inspections are handled as the build goes up. If a heavy machine or a large exhibit is going in, it enters before the walls close — which makes the delivery date of your product part of the installation plan.
What we need from you
When your products arrive, with weights and dimensions; the name and phone number of the person who will take handover; and the access times of any catering or equipment suppliers of your own.
- 06
On-site Support & Dismantling
Through the show days there is a technician you can reach; problems with lighting, power, surfaces or furniture are dealt with the same day. After the fair closes, dismantling happens inside the window the authority gives and the space is handed back — that window is short, and overrunning it carries a charge. Units intended for reuse are set aside and the rest is separated and removed. Photographing the stand during the fair gives you both an archive and the starting data for the next one.
What we need from you
Contact details for someone on the stand during the fair, removal of your products and valuable equipment before dismantling starts, and your decision on which parts are to be kept for reuse.
Services
Four lines of work, one responsibility.
We run every stage from design to dismantling. If you already have a design, we can take over at production.
Start here
Is your fair date getting close?
Send us your floor plan, your square metres and your date. On the first reply we will tell you plainly what is possible and what will not make it.
Quotes are free and commit you to nothing.